Facilities projects

New Schools

School Rounded total
Galm Area HS $152,500,000
Kallison Ranch Area MS $57,000,000
Village at WestPointe N Area ES $35,000,000
FM 471 North Area #4 ES $35,800,000

Existing facilities

Rayburn MS

Project Rounded total
Fine Arts Upgrade $3,300,000
Paving/Drainage Upgrade $1,076,000
Paving/Drainage Upgrade $352,000
Tennis Court Upgrade $89,000
Integrated Security Management System Upgrade $59,000
Mechanical - MDF Systems Replacement $13,653
Mechanical - IDF Systems Replacement $32,929
Roof Repair/Replacement/Waterproofing $964,480
Major Field Renovation $290,000

Jay HS

Project Rounded total
Fine Arts - Auditorium Replacement $47,800,000
Boiler Replacement $1,400,000
Roof Repair/Replacement/Waterproofing $681,200
Integrated Security Management System Upgrade $323,000
Mechanical - MDF Systems Replacement $13,289
Mechanical - IDF Systems Replacement $43,954
Science Lab Additions/Renovations - Vent Hoods Replacement $1,245,000
Paint Booth Replacement $400,000
Major Field Renovation $280,000

Elrod ES

Project Rounded total
Fine Arts Kiln Upgrade $600,000
Shades Over Playgrounds $77,268
Kitchen/Cafeteria Renovation $3,000,000
Security Lobby Upgrade $239,000
Integrated Security Management System Upgrade $100,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Brandeis HS

Project Rounded total
Multi-Purpose Field Synthetic Turf Replacement $1,375,000
Track Replacement $1,300,000
Paving/Drainage Upgrade $237,000
Tennis Court Upgrade $1,355,000

Brennan HS

Project Rounded total
Multi-Purpose Field Synthetic Turf Replacement $1,165,000
Track Resurface $209,600
Lighting Upgrade $330,000
Paving/Drainage Upgrade $47,000

Stevens HS

Project Rounded total
Multi-Purpose Field Synthetic Turf Replacement $1,220,000
Track Resurface $230,000
Clock/Bell System Upgrade $130,000
Integrated Security Management System Upgrade $322,000
Mechanical - MDF Systems Replacement $13,288
Mechanical - IDF Systems Replacement $43,953

Farris Athletic Complex

Project Rounded total
Football Field Synthetic Turf Replacement - Farris Stadium $700,000
Integrated Security Management System Upgrade $61,000
Integrated Security Management System Upgrade - Northside Swim Center $61,000
Mechanical - MDF Systems Replacement - Natatorium $13,743
Mechanical - MDF Systems Replacement $12,851
Mechanical - IDF Systems Replacement - Natatorium $32,483
Mechanical - IDF Systems Replacement $43,370
Integrated Security Management System Upgrade $136,000
Integrated Security Management System Upgrade - Northside Swim Center $136,000

Clark HS

Project Rounded total
Multi-Purpose Field Synthetic Turf Replacement $1,435,000
Track Resurface $209,600
Paving/Drainage Upgrade $2,702,000
Clock/Bell System Upgrade $125,000
Integrated Security Management System Upgrade $85,000
Mechanical - MDF Systems Replacement $13,289
Mechanical - IDF Systems Replacement $43,954
Major Field Renovation $295,000
Science Lab Additions/Renovations - Vent Hoods Replacement $1,330,000
Door Hardware Upgrade $185,000

Health Careers HS

Project Rounded total
Track Resurface $219,200
Science Lab Additions/Renovations - Vent Hoods Replacement $325,000
Lighting Upgrade $170,000
Clock/Bell System Upgrade $72,000
Fire Alarm Upgrade $195,000
PA Intercom System Upgrade $237,000
Integrated Security Management System Upgrade $85,000
Mechanical - MDF Systems Replacement $13,288
Mechanical - IDF Systems Replacement $43,954
Door Hardware Upgrade $142,000

Holmes HS

Project Rounded total
Track Resurface $219,000
Athletic Fields/Classrooms Upgrade $48,800,000
Paving/Drainage Upgrade $186,000
Integrated Security Management System Upgrade $464,000
Mechanical - MDF Systems Replacement $13,289
Mechanical - IDF Systems Replacement $43,954
Science Lab Additions/Renovations - Vent Hoods Replacement $1,400,000
Roof Repair/Replacement/Waterproofing $3,222,240
Paint Booth Replacement $400,000
Multi-Purpose Field Synthetic Turf Replacement $1,270,000

Marshall HS

Project Rounded total
Track Resurface $227,200
Magnet/CTE Upgrade $45,000,000
Clock/Bell System Upgrade $105,000
PA Intercom System Upgrade $471,000
Integrated Security Management System Upgrade $362,000
Mechanical - MDF Systems Replacement $13,289
Mechanical - IDF Systems Replacement $43,954
Major Field Renovation $295,000
Science Lab Additions/Renovations - Vent Hoods Replacement $1,200,000
Door Hardware Upgrade $165,000
Roof Repair/Replacement/Waterproofing $3,748,800
Multi-Purpose Field Synthetic Turf Replacement $1,270,000

O'Connor HS

Project Rounded total
Track Resurface $225,200
Flooring Upgrade $225,000
Clock/Bell System Upgrade $130,000
Integrated Security Management System Upgrade $91,000
Mechanical - MDF Systems Replacement $13,288
Mechanical - MDF Systems Replacement $13,743
Mechanical - IDF Systems Replacement $43,954
Mechanical - IDF Systems Replacement $32,483
Major Field Renovation $285,000
Agriculture Facility Upgrade $1,600,000
Multi-Purpose Field Synthetic Turf Replacement $1,165,000

Taft HS

Project Rounded total
Track Resurface $230,000
Library Addition/Renovation $5,600,000
Mechanical - Air Handler Unit Replacement $600,000
Clock/Bell System Upgrade $125,000
Integrated Security Management System Upgrade $273,000
Mechanical - MDF Systems Replacement $13,288
Mechanical - IDF Systems Replacement $43,954
Major Field Renovation $285,000
Major Field Renovation $280,000
Multi-Purpose Field Synthetic Turf Replacement $1,270,000

Warren HS

Project Rounded total
Track Resurface $230,200
Mechanical - Chiller Replacement $1,900,000
Paving/Drainage Upgrade $65,000
Tennis Court Upgrade $129,000
Integrated Security Management System Upgrade $81,000
Mechanical - MDF Systems Replacement $13,288
Mechanical - IDF Systems Replacement $43,954
Multi-Purpose Field Synthetic Turf Replacement $1,220,000

Hardin Athletic Complex

Project Rounded total
Synthetic Turf Replacement - Baseball Field $1,500,000
Synthetic Turf Replacement - Softball Field $1,500,000
Plumbing Upgrade - Gustafson Stadium $180,000
Clock/Bell System Upgrade $35,000
Integrated Security Management System Upgrade - Block Aquatic Center $59,000
Integrated Security Management System Upgrade - Gustafson Stadium $59,000
Integrated Security Management System Upgrade - NISD Activity Center $59,000
Integrated Security Management System Upgrade - Paul Taylor Field House $130,000
Mechanical - MDF Systems Replacement - NISD Activity Center $13,743
Mechanical - MDF Systems Replacement - Block Aquatic Center $12,851
Mechanical - MDF Systems Replacement - Annemarie Tennis Center $12,850
Mechanical - MDF Systems Replacement - Inselmann Baseball Field #1 $12,850
Mechanical - MDF Systems Replacement - Gustafson Stadium $12,850
Mechanical - MDF Systems Replacement - Baseball Field #2 $12,850
Mechanical - MDF Systems Replacement - Paul Taylor Field House $12,850
Mechanical - IDF Systems Replacement - NISD Activity Center $32,483
Mechanical - IDF Systems Replacement - Block Aquatic Center $43,370
Mechanical - IDF Systems Replacement - Annemarie Tennis Center $43,370
Mechanical - IDF Systems Replacement - Gustafson Stadium $43,370
Mechanical - IDF Systems Replacement - Inselmann Baseball Field #1 $43,370
Mechanical - IDF Systems Replacement - Baseball Field #2 $43,370
Mechanical - IDF Systems Replacement - Paul Taylor Field House $43,370
Integrated Security Management System Upgrade - Block Aquatic Center $130,000
Integrated Security Management System Upgrade - Gustafson Stadium $130,000
Integrated Security Management System Upgrade - NISD Activity Center $97,000

Leon Valley ES

Project Rounded total
Fire Sprinkler System Upgrade $800,000
Administration Upgrade $7,700,000
Window Upgrade and ADA Accessibility Upgrade $345,000
Shades Over Playgrounds $80,087
Lighting Upgrade $145,000
Paving/Drainage Upgrade $603,000
Integrated Security Management System Upgrade $136,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Door Hardware Upgrade $88,000

Knowlton ES

Project Rounded total
Fire Sprinkler System Upgrade $1,100,000
Shades Over Playgrounds $77,268
Electrical Upgrade $250,000
Lighting Upgrade $65,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Timberwilde ES

Project Rounded total
Fire Sprinkler System Upgrade $500,000
Shades Over Playgrounds $82,908
Integrated Security Management System Upgrade $131,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Mechanical - VFD Controls Upgrade $40,000

Adams Hill ES

Project Rounded total
Administration Upgrade $6,300,000
Shades Over Playgrounds $73,871
Fire Alarm Upgrade $260,000
Integrated Security Management System Upgrade $81,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Roof Repair/Replacement/Waterproofing $1,362,400

Neff MS

Project Rounded total
Cafeteria Upgrade $5,900,000
Mechanical - Roof Top Unit Replacement $1,800,000
Clock/Bell System Upgrade $48,000
Integrated Security Management System Upgrade $262,000
Mechanical - MDF Systems Replacement $13,653
Mechanical - IDF Systems Replacement $32,929
Major Field Renovation $455,000
Integrated Security Management System Upgrade $84,000

Westwood Terrace ES

Project Rounded total
Classrooms Replacement $15,400,000
Shades Over Playgrounds $82,908
Electrical Upgrade $265,000
Security Lobby Upgrade $220,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Glenoaks ES

Project Rounded total
Library/Classrooms Upgrade $5,700,000
Shades Over Playgrounds $77,268
Mechanical - Chiller Replacement $975,000
Lighting Upgrade $145,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Roof Repair/Replacement/Waterproofing $449,360

Powell ES

Project Rounded total
Cafeteria/Gym Upgrade $11,000,000
Shades Over Playgrounds $82,908
Mechanical - Roof Top Unit Replacement $800,000
Plumbing Upgrade $110,000
Integrated Security Management System Upgrade $136,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Door Hardware Upgrade $120,000
Roof Repair/Replacement/Waterproofing $1,885,760

Glass ES

Project Rounded total
Cafeteria/Gym Upgrade $14,800,000
Special Education - ALE Upgrade $2,800,000
Shades Over Playgrounds $77,268
Mechanical - Roof Top Unit Replacement $1,750,000
Mechanical - Chiller Replacement $427,000
Boiler Replacement $750,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Cody ES

Project Rounded total
Bus/Student Covered Walkways $700,000
Shades Over Playgrounds $73,883
Integrated Security Management System Upgrade $97,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Mechanical - VFD Controls Upgrade $10,000

Rhodes ES

Project Rounded total
Bus/Student Covered Walkways $700,000
Shades Over Playgrounds $82,908
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Meadow Village ES

Project Rounded total
Special Education - ALE Upgrade $2,100,000
Shades Over Playgrounds $80,087
Mechanical - Roof Top Unit Replacement $3,200,000
Paving/Drainage Upgrade $825,000
Paving/Drainage Upgrade $-
Fire Alarm Upgrade $300,000
Integrated Security Management System Upgrade $99,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Esparza ES

Project Rounded total
Special Education - ALE Upgrade $2,800,000
Window Upgrade and ADA Accessibility Upgrade $350,000
Shades Over Playgrounds $77,268
Plumbing Upgrade $200,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Cable ES

Project Rounded total
Special Education - ALE Upgrade $2,900,000
Window Upgrade and ADA Accessibility Upgrade $625,000
Shades Over Playgrounds $73,883
PA Intercom System Upgrade $166,000
Integrated Security Management System Upgrade $190,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Door Hardware Upgrade $76,000

Boone ES

Project Rounded total
Window Upgrade and ADA Accessibility Upgrade $75,000
Shades Over Playgrounds $73,883
Mechanical - Chiller Replacement $733,000
Integrated Security Management System Upgrade $100,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Allen ES

Project Rounded total
Shades Over Playgrounds $73,883
Mechanical - Chiller Replacement $775,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Aue ES

Project Rounded total
Shades Over Playgrounds $73,883
Security Lobby Upgrade $204,000

Beard ES

Project Rounded total
Shades Over Playgrounds $73,883
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Mechanical - VFD Controls Upgrade $30,000

Behlau ES

Project Rounded total
Shades Over Playgrounds $73,883
Security Lobby Upgrade $195,000

Blattman ES

Project Rounded total
Shades Over Playgrounds $73,883
Lighting Upgrade $60,000
Security Lobby Upgrade $231,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Boldt ES

Project Rounded total
Shades Over Playgrounds $73,883

Brauchle ES

Project Rounded total
Shades Over Playgrounds $73,883
Flooring Upgrade $210,000
Security Lobby Upgrade $239,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Braun Station ES

Project Rounded total
Shades Over Playgrounds $73,883
Boiler Replacement $625,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Burke ES

Project Rounded total
Shades Over Playgrounds $73,883
Energy Control Systems Upgrade $255,000
Security Lobby Upgrade $239,000
Integrated Security Management System Upgrade $131,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Carlos Coon ES

Project Rounded total
Shades Over Playgrounds $73,883
Energy Control Systems Upgrade $255,000
Electrical Upgrade $285,000
Lighting Upgrade $65,000
Paving/Drainage Upgrade $1,614,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Carnahan ES

Project Rounded total
Shades Over Playgrounds $73,883
Security Lobby Upgrade $231,000

Carson ES

Project Rounded total
Shades Over Playgrounds $73,883
Mechanical - Chiller Replacement $1,765,000
Energy Control Systems Upgrade $260,000
Security Lobby Upgrade $239,000
Integrated Security Management System Upgrade $131,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Cole ES

Project Rounded total
Shades Over Playgrounds $73,883

Colonies North ES

Project Rounded total
Shades Over Playgrounds $73,883
Mechanical - Chiller Replacement $860,000
Paving/Drainage Upgrade $757,000
Security Lobby Upgrade $231,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Driggers ES

Project Rounded total
Shades Over Playgrounds $73,883
Fire Alarm Upgrade $175,000
Security Lobby Upgrade $247,000
Mechanical - VFD Controls Upgrade $40,000

Ellison ES

Project Rounded total
Shades Over Playgrounds $73,883

Evers ES

Project Rounded total
Shades Over Playgrounds $77,268
Mechanical - Chiller Replacement $1,800,000
Security Lobby Upgrade $220,000
Integrated Security Management System Upgrade $115,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Fernandez ES

Project Rounded total
Shades Over Playgrounds $77,268
Mechanical - VAV System Upgrade $4,850,000
Flooring Upgrade $510,000
Security Lobby Upgrade $239,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Roof Repair/Replacement/Waterproofing $261,280

Fields ES

Project Rounded total
Shades Over Playgrounds $77,268

Fisher ES

Project Rounded total
Shades Over Playgrounds $77,268
Fire Alarm Upgrade $190,000
Security Lobby Upgrade $220,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Mechanical - VFD Controls Upgrade $40,000

Forester ES

Project Rounded total
Shades Over Playgrounds $77,268

Franklin ES

Project Rounded total
Shades Over Playgrounds $77,268
Security Lobby Upgrade $219,000

Galm ES

Project Rounded total
Shades Over Playgrounds $77,268
Energy Control Systems Upgrade $255,000
Lighting Upgrade $55,000
Paving/Drainage Upgrade $1,023,000
Flooring Upgrade $515,000
Security Lobby Upgrade $220,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Glenn ES

Project Rounded total
Shades Over Playgrounds $77,268
Energy Control Systems Upgrade $280,000
Flooring Upgrade $64,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Roof Repair/Replacement/Waterproofing $372,640

Hatchett ES

Project Rounded total
Shades Over Playgrounds $77,268
Paving/Drainage Upgrade $135,000
Paving/Drainage Upgrade $647,000
Fire Alarm Upgrade $200,000
Security Lobby Upgrade $220,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Helotes ES

Project Rounded total
Shades Over Playgrounds $77,268
Paving/Drainage Upgrade $233,000
Flooring Upgrade $135,000
Security Lobby Upgrade $239,000
PA Intercom System Upgrade $121,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Door Hardware Upgrade $109,000

Henderson ES

Project Rounded total
Shades Over Playgrounds $77,268
Security Lobby Upgrade $219,000

Hoffmann ES

Project Rounded total
Shades Over Playgrounds $77,268

Holmgreen Center

Project Rounded total
Shades Over Playgrounds $77,268
Flooring Upgrade $49,000
Fire Alarm Upgrade $82,000
Security Lobby Upgrade $247,000
Mechanical - MDF Systems Replacement $13,493
Mechanical - IDF Systems Replacement $22,488

Howsman ES

Project Rounded total
Shades Over Playgrounds $77,268
Lighting Upgrade $145,000
Security Lobby Upgrade $231,000
Integrated Security Management System Upgrade $127,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Kallison ES

Project Rounded total
Shades Over Playgrounds $77,268

Krueger ES

Project Rounded total
Shades Over Playgrounds $80,087
Security Lobby Upgrade $239,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Kuentz ES

Project Rounded total
Shades Over Playgrounds $80,087
Security Lobby Upgrade $211,000

Langley ES

Project Rounded total
Shades Over Playgrounds $80,087
Security Lobby Upgrade $195,000

Leon Springs ES

Project Rounded total
Shades Over Playgrounds $80,087
Mechanical - Chiller Replacement $670,000
Security Lobby Upgrade $231,000
Integrated Security Management System Upgrade $167,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Lewis ES

Project Rounded total
Shades Over Playgrounds $80,087
Flooring Upgrade $432,000
Fire Alarm Upgrade $670,000
Security Lobby Upgrade $220,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Lieck ES

Project Rounded total
Shades Over Playgrounds $80,087
Security Lobby Upgrade $195,000

Linton ES

Project Rounded total
Shades Over Playgrounds $80,087
Paving/Drainage Upgrade $745,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Window Upgrade and ADA Accessibility Upgrade $805,000

Locke Hill ES

Project Rounded total
Shades Over Playgrounds $80,087
Energy Control Systems Upgrade $255,000
Lighting Upgrade $140,000
PA Intercom System Upgrade $165,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Los Reyes ES

Project Rounded total
Shades Over Playgrounds $80,087
Security Lobby Upgrade $211,000

Martin ES

Project Rounded total
Shades Over Playgrounds $80,087
Security Lobby Upgrade $195,000

Mary Hull ES

Project Rounded total
Shades Over Playgrounds $80,087
Library Addition/Renovation $1,800,000
Mechanical - Roof Top Unit Replacement $1,300,000
Boiler Replacement $890,000
Paving/Drainage Upgrade $914,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Mechanical - VFD Controls Upgrade $40,000
Roof Repair/Replacement/Waterproofing $215,840

May ES

Project Rounded total
Shades Over Playgrounds $80,087
Mechanical - Chiller Replacement $1,225,000
Boiler Replacement $935,000
Energy Control Systems Upgrade $280,000
Flooring Upgrade $175,000
Security Lobby Upgrade $231,000
Integrated Security Management System Upgrade $155,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

McAndrew ES

Project Rounded total
Shades Over Playgrounds $80,087
Security Lobby Upgrade $204,000

McDermott ES

Project Rounded total
Shades Over Playgrounds $80,087
Lighting Upgrade $150,000
Paving/Drainage Upgrade $353,000
Integrated Security Management System Upgrade $127,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Door Hardware Upgrade $142,000

Mead ES

Project Rounded total
Shades Over Playgrounds $80,087
Paving/Drainage Upgrade $637,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Michael ES

Project Rounded total
Shades Over Playgrounds $80,087
Energy Control Systems Upgrade $335,000
Paving/Drainage Upgrade $472,000
Integrated Security Management System Upgrade $146,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Roof Repair/Replacement/Waterproofing $1,828,960

Mireles ES

Project Rounded total
Shades Over Playgrounds $80,087
Security Lobby Upgrade $218,000

Murnin ES

Project Rounded total
Shades Over Playgrounds $80,087
Fire Alarm Upgrade $205,000
Security Lobby Upgrade $220,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Myers ES

Project Rounded total
Shades Over Playgrounds $82,908
Energy Control Systems Upgrade $295,000
Security Lobby Upgrade $247,000
Integrated Security Management System Upgrade $158,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Nichols ES

Project Rounded total
Shades Over Playgrounds $82,908
Security Lobby Upgrade $231,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Northwest Crossing ES

Project Rounded total
Shades Over Playgrounds $82,908
Kitchen/Cafeteria Renovation $2,800,000
Electrical Upgrade $250,000
Lighting Upgrade $55,000
Security Lobby Upgrade $239,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Door Hardware Upgrade $110,000

Oak Hills Terrace ES

Project Rounded total
Shades Over Playgrounds $82,908
Energy Control Systems Upgrade $280,000
Lighting Upgrade $65,000
Clock/Bell System Upgrade $48,000
Security Lobby Upgrade $218,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Ott ES

Project Rounded total
Shades Over Playgrounds $82,908
Security Lobby Upgrade $247,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Passmore ES

Project Rounded total
Shades Over Playgrounds $82,908
Library Addition/Renovation $1,800,000
Mechanical - Roof Top Unit Replacement $2,050,000
Integrated Security Management System Upgrade $121,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Roof Repair/Replacement/Waterproofing $1,658,560

Raba ES

Project Rounded total
Shades Over Playgrounds $82,908
Security Lobby Upgrade $247,000
Integrated Security Management System Upgrade $129,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Scarborough ES

Project Rounded total
Shades Over Playgrounds $82,908
Security Lobby Upgrade $247,000

Scobee ES

Project Rounded total
Shades Over Playgrounds $82,908
Mechanical - Chiller Replacement $1,450,000
Clock/Bell System Upgrade $50,000
Security Lobby Upgrade $231,000
Integrated Security Management System Upgrade $127,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Door Hardware Upgrade $77,000

Steubing ES

Project Rounded total
Shades Over Playgrounds $82,908
Mechanical - Chiller Replacement $1,200,000
Security Lobby Upgrade $239,000
Integrated Security Management System Upgrade $156,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Roof Repair/Replacement/Waterproofing $458,640

Thornton ES

Project Rounded total
Shades Over Playgrounds $82,908
Fire Alarm Upgrade $145,000
Integrated Security Management System Upgrade $96,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Door Hardware Upgrade $111,000

Valley Hi ES

Project Rounded total
Shades Over Playgrounds $82,908
Mechanical - Roof Top Unit Replacement $2,600,000
Paving/Drainage Upgrade $407,000
PA Intercom System Upgrade $110,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Villarreal ES

Project Rounded total
Shades Over Playgrounds $82,908
Mechanical - Roof Top Unit Replacement $4,150,000
Clock/Bell System Upgrade $48,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699
Door Hardware Upgrade $120,000
Roof Repair/Replacement/Waterproofing $3,339,840

Wanke ES

Project Rounded total
Shades Over Playgrounds $82,908
Security Lobby Upgrade $204,000
Mechanical - MDF Systems Replacement $13,621
Mechanical - IDF Systems Replacement $21,698

Ward ES

Project Rounded total
Shades Over Playgrounds $82,908
Fire Alarm Upgrade $411,000
Security Lobby Upgrade $239,000
Mechanical - MDF Systems Replacement $13,611
Mechanical - IDF Systems Replacement $21,699

Rudder MS

Project Rounded total
Kitchen/Cafeteria Renovation $5,200,000
Clock/Bell System Upgrade $50,000
Fire Alarm Upgrade $751,000
PA Intercom System Upgrade $130,000
Integrated Security Management System Upgrade $61,000
Mechanical - MDF Systems Replacement $13,653
Mechanical - IDF Systems Replacement $32,929
Major Field Renovation $425,000

Districtwide

Project Rounded total
Library Additions/Renovations - Furniture Replacement $3,800,000
Integrated Security Management System Upgrade $2,275,000
Integrated Security Management System Upgrade $4,658,000
Integrated Security Management System Upgrade $116,000

Luna MS

Project Rounded total
Science Lab Addition/Renovation $5,500,000
Flooring Upgrade $190,000
Integrated Security Management System Upgrade $61,000
Mechanical - MDF Systems Replacement $13,654
Mechanical - IDF Systems Replacement $32,928
Major Field Renovation $460,000

Hobby MS

Project Rounded total
Science Lab Addition/Renovation $7,400,000
Mechanical - Roof Top Unit Replacement $4,450,000
Clock/Bell System Upgrade $50,000
Integrated Security Management System Upgrade $61,000
Mechanical - MDF Systems Replacement $13,653
Mechanical - IDF Systems Replacement $32,929
Major Field Renovation $455,000
Bus/Student Covered Walkways $2,900,000

Maintenance - Mainland

Project Rounded total
Mechanical - Roof Top Unit Replacement - Custodial Annex $450,000
Mechanical - Roof Top Unit Replacement $900,000
Plumbing Upgrade $55,000
Mechanical - MDF Systems Replacement $13,743
Mechanical - IDF Systems Replacement $32,482

NISD Support Services Center

Project Rounded total
Mechanical - Computer Room Air Conditioning Unit Replacement $400,000
Plumbing Upgrade - Warehouse $55,000
Integrated Security Management System Upgrade $59,000
Mechanical - MDF Systems Replacement $13,743
Mechanical - IDF Systems Replacement $32,483

Pease MS

Project Rounded total
Mechanical - Chiller Replacement $1,700,000
Lighting Upgrade $160,000
Integrated Security Management System Upgrade $59,000
Mechanical - MDF Systems Replacement $13,653
Mechanical - IDF Systems Replacement $32,929
Major Field Renovation $440,000

Jones MS

Project Rounded total
Energy Control Systems Upgrade $550,000
Integrated Security Management System Upgrade $59,000
Mechanical - MDF Systems Replacement $13,653
Mechanical - IDF Systems Replacement $32,929
Major Field Renovation $440,000
Mechanical - VFD Controls Upgrade $80,000
Door Hardware Upgrade $90,000

Central Office

Project Rounded total
Electrical Upgrade $150,000
Clock/Bell System Upgrade $40,000
Integrated Security Management System Upgrade $66,000
Mechanical - MDF Systems Replacement $13,743
Mechanical - IDF Systems Replacement $32,482

Zachry MS

Project Rounded total
Electrical Upgrade $500,000
Lighting Upgrade $55,000
Fire Alarm Upgrade $661,000
PA Intercom System Upgrade $112,000
Integrated Security Management System Upgrade $184,000
Mechanical - MDF Systems Replacement $13,654
Mechanical - IDF Systems Replacement $32,929
Integrated Security Management System Upgrade $64,000
Major Field Renovation $290,000

Family Engagement Center

Project Rounded total
Lighting Upgrade $45,000
Mechanical - MDF Systems Replacement $13,493
Mechanical - IDF Systems Replacement $22,488

Transportation - McClung

Project Rounded total
Lighting Upgrade $155,000
Integrated Security Management System Upgrade $59,000

Transportation - North

Project Rounded total
Lighting Upgrade $70,000
Integrated Security Management System Upgrade $55,000
Mechanical - MDF Systems Replacement $13,742
Mechanical - IDF Systems Replacement $32,483

Transportation - South

Project Rounded total
Lighting Upgrade $70,000
Integrated Security Management System Upgrade $52,000
Mechanical - MDF Systems Replacement $13,742
Mechanical - IDF Systems Replacement $32,483

Transportation - Culebra

Project Rounded total
Lighting Upgrade $60,000
Integrated Security Management System Upgrade $52,000

Transportation - Rhodes

Project Rounded total
Lighting Upgrade $60,000
Integrated Security Management System Upgrade $59,000
Mechanical - MDF Systems Replacement $13,742
Mechanical - IDF Systems Replacement $32,483

Sul Ross MS

Project Rounded total
Lighting Upgrade $160,000
Tennis Court Upgrade $1,150,000
Integrated Security Management System Upgrade $66,000
Mechanical - MDF Systems Replacement $13,653
Mechanical - IDF Systems Replacement $32,929
Major Field Renovation $455,000
Mechanical - VFD Controls Upgrade $40,000

Stinson MS

Project Rounded total
Lighting Upgrade $175,000
PA Intercom System Upgrade $111,000
Door Hardware Upgrade $165,000
Integrated Security Management System Upgrade $135,000
Mechanical - MDF Systems Replacement $13,654
Mechanical - IDF Systems Replacement $32,929
Major Field Renovation $440,000

Alternative MS

Project Rounded total
Paving/Drainage Upgrade $641,000
Mechanical - MDF Systems Replacement $13,493
Mechanical - IDF Systems Replacement $22,488

Reddix Center

Project Rounded total
Paving/Drainage Upgrade $829,000
Clock/Bell System Upgrade $44,000
Integrated Security Management System Upgrade $127,000
Mechanical - MDF Systems Replacement $13,492
Mechanical - IDF Systems Replacement $22,488

Connally MS

Project Rounded total
Tennis Court Upgrade $89,000
Integrated Security Management System Upgrade $144,000
Mechanical - MDF Systems Replacement $13,654
Mechanical - IDF Systems Replacement $32,929
Major Field Renovation $440,000

Jordan MS

Project Rounded total
Tennis Court Upgrade $89,000
Flooring Upgrade $495,000
PA Intercom System Upgrade $109,000
Integrated Security Management System Upgrade $59,000
Mechanical - MDF Systems Replacement $13,654
Mechanical - IDF Systems Replacement $32,929
Major Field Renovation $425,000

Stevenson MS

Project Rounded total
Tennis Court Upgrade $99,000
PA Intercom System Upgrade $168,000
Integrated Security Management System Upgrade $64,000
Mechanical - MDF Systems Replacement $13,653
Mechanical - IDF Systems Replacement $32,929
Major Field Renovation $425,000
Major Renovation - Athletic/PE Upgrade $18,500,000

Rawlinson MS

Project Rounded total
Fire Alarm Upgrade $755,000
Integrated Security Management System Upgrade $61,000
Mechanical - MDF Systems Replacement $13,654
Mechanical - IDF Systems Replacement $32,929
Major Field Renovation $440,000

Police Department

Project Rounded total
Security Lobby Upgrade $52,000
Mechanical - MDF Systems Replacement $13,743
Mechanical - IDF Systems Replacement $32,483

NISD Learning Center

Project Rounded total
PA Intercom System Upgrade $100,000
Integrated Security Management System Upgrade $63,000
Mechanical - MDF Systems Replacement $13,743
Mechanical - IDF Systems Replacement $32,483
Integrated Security Management System Upgrade $106,000

Child Nutrition Center

Project Rounded total
Integrated Security Management System Upgrade $102,000
Integrated Security Management System Upgrade $64,000

Human Resources

Project Rounded total
Integrated Security Management System Upgrade $64,000
Mechanical - MDF Systems Replacement $13,743
Mechanical - IDF Systems Replacement $32,482

Maintenance / Child Nutrition

Project Rounded total
Integrated Security Management System Upgrade $131,000

Alternative HS

Project Rounded total
Integrated Security Management System Upgrade $127,000
Mechanical - MDF Systems Replacement $13,493
Mechanical - IDF Systems Replacement $22,488

NISD Tennis Center

Project Rounded total
Integrated Security Management System Upgrade $59,000

Teicher Student Services

Project Rounded total
Integrated Security Management System Upgrade $64,000
Mechanical - MDF Systems Replacement $13,742
Mechanical - IDF Systems Replacement $32,483

Vale MS

Project Rounded total
Integrated Security Management System Upgrade $59,000
Major Field Renovation $440,000

Business Careers HS

Project Rounded total
Mechanical - MDF Systems Replacement $13,288
Mechanical - IDF Systems Replacement $43,954

Communication Arts HS

Project Rounded total
Mechanical - MDF Systems Replacement $13,288
Mechanical - IDF Systems Replacement $43,954

Child Nutrition & Warehouse

Project Rounded total
Mechanical - MDF Systems Replacement $13,743
Mechanical - IDF Systems Replacement $32,482

Grissom Annex

Project Rounded total
Mechanical - MDF Systems Replacement $13,743
Mechanical - IDF Systems Replacement $32,482

Maintenance North

Project Rounded total
Mechanical - MDF Systems Replacement $13,743
Mechanical - IDF Systems Replacement $32,483

Kelly Smith Technology Center

Project Rounded total
Mechanical - MDF Systems Replacement $13,742
Mechanical - IDF Systems Replacement $32,483

Testing Warehouse

Project Rounded total
Mechanical - MDF Systems Replacement $13,742
Mechanical - IDF Systems Replacement $32,483

Jefferson MS

Project Rounded total
Major Field Renovation $460,000

Harlan HS

Project Rounded total
Multi-Purpose Field Synthetic Turf Replacement $1,270,000